Showing posts with label Joji. Show all posts
Showing posts with label Joji. Show all posts

Saturday, 1 December 2018

all FOs

Quiet on the blog, busy with the knitting.  Trying to carve out more knitting time and focusing on depleting the stash. 

Finished projects are almost all accessories:

Coastal walk by Joji Locatelli (Malabrigo Arroyo)
Sharman by Bristol Ivy - more like a shrug than an accessory but wears more like a shawl than a cardigan. 

Oldcastle Hat by Lisa Mutch (Malabrigo Mecha)

Tread Hat by Shannon Cook (Juniper Moon Stratus)


Lanes Cardigan by Joji Locatelli (Twilleys of Stamford Mist) - pattern is from Laine Magazine (No. 1), my favourite issue so far.  I've knit 2 items from it so far with a third ready to cast on.  All of the Laine patterns definitely match my aesthetic.  I find the muted colours, classic shapes, and natural fibres fit with what I want to knit right now.  More coming as I queue and cast on (next post?).

Trellis Mitts by Mari Muinonen (Briggs and Little Heritage)

Mittens are from Vogue Knitting, part of my "Then and Now" KAL - challenge was to pick a pattern from 2018 edition, and another from a decade prior (any issue with a year ending in '8').  These are my "then", coming from the Fall 2008 magazine. 

My "now" project is a four-colour shawl from the Fall 2018 issue.  It's knit in worsted weight and again I'm using yarn from stash (Cascade 220- black, Estelle Worsted - cranberry, Cornelia Hamilton worsted - gold, and Berroco Vintage - gray)

It's a lot of garter with a bit of lace and texture to break it up.  Easy knitting while watching tv!


Blogging seems a bit 'past' but I do like archiving the projects and my thoughts here.  May be to an audience of none, but I still have goals for the next few months.  December is here and as I think ahead I'd like to set more of a schedule so that I can get into a routine here. 

Thursday, 16 November 2017

in between

Feels like the fall rush of starting cozy things has passed, but the rush to finish by Christmas isn't quite here yet.  In between means settling in to finish things I've started and plan for what comes next.  Some things are done, like my Jaded Sleeveless Turtleneck from Vogue Knitting Fall 2017.  It's modeled with bare arms - lovely but highly unlikely to be worn that way by me here in Canada!  I love the finished product, and it's my kind of garment.  Layers, cozy neck, bulky knit, texture...


I've also finished my Girl From the Grocery Store shawl by Joji Locatelli.  Ends are woven in (although not in this picture!).  The yarn is Canadian, Merino Slim by FleeceArtist.

Rye Cardigan by Thea Coleman has buttons and is blocked.  The neckline is a bit wide for me, and it slips slightly to the right, making the front look assymetrical by an inch or so.  I am not off-kilter, so it must be my blocking or finishing.  It's not seamed.  I think I'm better with pieces that I can seam when it comes to fit and finish.  Still like it though!

In progress are a poncho from Knitscene Winter - Hvil.  It's a gift for a friend for her birthday.

The other is a very colourful shawl by Andrea Mowry - Goldfinch.  I'm knitting it for a KAL with my LYS in SweetGeorgia Superwash Sport (green), Cascade 220 sport (pink) and Mineville Project yarn (speckles). The pink is a bit brighter than I usually choose but the pattern is fun to knit with lace, short rows, and stripes (oh my!).

Sunday, 22 October 2017

slow down, you think too fast

I'm constantly attempting to balance my need to "keep on schedule" and "get things done" with the very real anxiety that comes with that kind of drive.  These are self-imposed deadlines, most of the time.  Even when I knit a gift, I am aware that I have the means (time, money) to purchase an equally appropriate gift for the recipient.  These deadlines loom, on top of the very real deadlines at work and the equally demanding time limits imposed on my life as I get my children to school, sports, activities, and social opportunities.

I picked up a copy of Slow Knitting at Indigo Books last week.  I almost put it back as it was close to $40 with taxes.  But then I thought - I want to change my perspective and focus on enjoying what I make instead of starting things that become deadline-driven.

The book focuses on knowing where your wool comes from, how your materials turn into finished objects, and the connection between paying attention to these farm-to-sweater details helps you enjoy the process as much as the product.  The designs also focus on texture, stitch details, and shape - things that slow down the knitting.  Moves you away from choosing projects that will finish quickly and toward projects that give the knitter a sense of connection to the product.  By having to count rows, stitches, charts, patterns, the knitter becomes more aware of the process of making.

This makes sense.... but also means I may finish fewer things.  I don't knit just to have things, but I do like to plan, browse through patterns and books, shop for yarn, and cast on.  This part leaves me with many items in the queue that I want to knit but don't have time for.  This feeling of wanting to make more will be hard to let go.

With that in mind, I'm finishing some shawls:
Girl from the Grocery Store (just needs ends woven in):
Goldfinch:  about a third of the way done (more than in the photo):

When these are done, I hope to cast on a project from the book.  Not sure which one yet, but I'm leaning toward the cabled pullover by Norah Gaughan.  It's an unusual construction, of course, but in a worsted weight yarn that will give me a break from finer gauge shawls that seem to have taken over my knitting plans.

All of this will, I hope, lead to more joy in the process.  I do love to knit, to see the fabric grow beneath the stitches on the needle.  Fall and Winter seem perfect seasons for slowing down as the demands of life continue to pick up.

Sunday, 10 September 2017

back to school

Every summer I forget how little knitting time I have when I'm working full time, running a household, and parenting two very active and athletic kids.  My knitting slows to an almost-halt as the school year starts.  Still, I've managed to almost finish two WIPs:

I knit a Campside shawl by Alicia Plummer to give as a gift this year to a teacher.  She's into camping and has taught my child for two years now, so she's knit-worthy!  It's more blue than gray, and just needs the ends woven in.


I've also finished the knitting for my Rye cardigan by Thea Colman (Baby Cocktails), from the Berroco Portfolio Volume 1 collection.  I need to seam the sleeves (I knit them flat), sew on buttons and block it.  Hope to finish today!

I had problems with the symmetry of the decreases - didn't notice until I was almost done so I've left it for now but may rip back.  I think the error was in when I decided to keep the bramble pattern or not, leaving fewer stitches in the texture panel on one front compared to the other.  We'll see how much it bothers me when it's done.

Up next is another Lowlands Hat which uses grafting in garter stitch which is this month's technique for A Year of Techniques.  I'll be knitting a pattern I own using stash yarn, as I've done each month.  The patterns in the book (just published) are gorgeous but I'm challenging myself to knit what I have. At least for this series of projects!

I am also casting on a Joji Locatelli shawl:  The Girl in the Grocery Store using Fleece Artist Merino Slim in a purplish gray colour and a cream with the purplish speckles.   I have other shawls in the queue including a MKAL with Sweet Georgia Yarn that starts in mid October.

Now if I could just knit more and work less, I'd get it all done!

Saturday, 27 May 2017

More knitting (less everything else!)...

A month since posts... I do so  much on my ipad, and can't quite figure out how to post images and create a blog post on that device.  I'm looking into it as I know I'd post more often from that device than the laptop.  Laptop signals "work" for me, while I use my iPad for "fun" things.

I broke out the sewing machine last month and made a top:  Sorbetto by Collette Patterns (a free top pattern).  I also made a "One Hour Top" by Fancy Tiger Crafts but the photo is on Instagram and I'm on my laptop.  Too many technological devices?!!

On the knitting front I've made a lot of small accessories, finished a KAL, and then got very distracted by a Mystery KAL.  

First, I finished a cowl using Noro Gingo and a pattern from my LYS.  It's more colourful than the photo shows, with mauve and green and gray:

I also knit a cowl using Briggs and Little Durasport, also in gray.  It's a bit scratchy but I'll wear it a lot in the fall.  Pattern is from PomPom Magazine, called Striated:

I also got sidetracked by a first birthday gift for my nephew.  I used stash yarn and a free pattern by Joji Locatelli called "Lolo's Vest".  Mine is more colourful than the original, as I didn't have enough of the red or the gray (my original plan) so added in some blue:

I also cast on a hat using the 'pinhole cast-on' for my Year of Techniques project this month.  This month's pattern is a cute knitted mouse.  I live with pre-teen boys and a lot of sports gear... and I am not keen on knitting toys (although these  may get knit one day!).  I'm trying to knit all of my 'technique' projects using stash yarn and patterns I own, so I chose some leftover Berroco Alpaca and cast on an Amstel Hat:

I'm no further along than this, as I am very distracted by my "Starting Point" MKAL with Joji Locatelli.  SPOILER picture is about to come up, but it's only clue one and a bit of clue two, so not really a big surprise anymore as clue 3 was released.  I'm not sure about the colours now that I"m knitting, as it's a lot more colourful than I usually knit.  I knit bright things (like the hat above) but usually in a monochromatic, solid colour.  The mix of colours is very far out of my comfort zone.  This means it will get worn with a lot of gray and black, I imagine!  
Yarns:  Zara (mauve), Berroco Ultra Alpaca Fine (orange), Sweet Georgia Toughlove sock (variegated), Sweet Georgia Bulletproof Sock (Blue), Alegria (gray):

More on this when it's done, as I don't want to give too much away.  I'm trying to keep up with the pace of the KAL, so I have a few days to do a LOT of knitting - the project uses close to 2000 yards in 4 weeks....  

All of this knitting means less of other things.  Like housework, school work, reading, etc.  I'm okay with this, but my house is looking a little dusty and my report cards loom ahead!